Crack in Ames Building

1 gelatin dry plate glass negative

Crack in Ames Building

1 gelatin dry plate glass negative

Crack in Ames Building

1 gelatin dry plate glass negative

Boilers - power plant for sec.C

1 gelatin dry plate glass negative

Boiler room of powerhouse, sec.C EBT

1 gelatin dry plate glass negative

Air compressors sec.C EBT

1 gelatin dry plate glass negative

Lowering air lock, Sec C. EBT

1 gelatin dry plate glass negative

Lowering air lock, sec.A, EBT

1 gelatin dry plate glass negative

Lowering air lock, sec.A, EBT

1 gelatin dry plate glass negative

Getting ready to lower air lock sec.C, EBT

1 gelatin dry plate glass negative

Showing air lock for sec.C, EBT getting ready to lower same

1 gelatin dry plate glass negative

Interior view of a tunnel, 1902

1 gelatin dry plate glass negative

Interior view of a tunnel with workers, possibly near an air lock

1 gelatin dry plate glass negative

Inside a tunnel with men at work on the right

1 gelatin dry plate glass negative

Concrete sheeting test section at Ames Building, Sec F EBT, Boston, Mass., December 27, 1902

The concrete sheeting test is for the East Boston Tunnel of the subway system. The labeled sections in the image read "Sidewall," "Concrete Sheeting," "Back-Wall" and "Foundation of Ames Bldg."

Conduits, pipes, manholes etc., south side State St. at Brazer Building, Boston, Mass., December 24, 1902

The below ground structure of the second Brazer Building, designed by Cass Gilbert, is seen in this image. Subway construction was taking place at this site.

Test of concrete beam #5 with 4 painted corr. rods

1 gelatin dry plate glass negative

65 to 66 Long Wharf

1 gelatin dry plate glass negative

Building on south side of Long Wharf

1 gelatin dry plate glass negative

Building 22 to 27 Long Wharf

1 gelatin dry plate glass negative

Building 27 to 35 Long Wharf

1 gelatin dry plate glass negative

Building no. 68 & 69 Long Wharf

1 gelatin dry plate glass negative

Easterly end of Custom House block buildings on Long Wharf

1 gelatin dry plate glass negative

Cracks in southerly corner of Custom House block on Long Wharf

1 gelatin dry plate glass negative

Crack in wall of 12 Long Wharf north side of building

1 gelatin dry plate glass negative

Building no.57 Long Wharf

1 gelatin dry plate glass negative

Building no.67 and 68 Long Wharf

1 gelatin dry plate glass negative

Part of building used by Dom. Atl. on Long Wharf

1 gelatin dry plate glass negative

Northeast corner of Custom House block Long Wharf

1 gelatin dry plate glass negative

Building on south side of Long Wharf 1+2

1 gelatin dry plate glass negative

West side of building no.12 Long Wharf

1 gelatin dry plate glass negative

Crack in southeast corner of Custom House Block, Long Wharf

1 gelatin dry plate glass negative

East Wall of no. 60 Long Wharf

1 gelatin dry plate glass negative

Northeast corner of building no.60 Long Wharf showing cracks in brickwork

1 gelatin dry plate glass negative

Ruins of shed at easterly end of Long Wharf

1 gelatin dry plate glass negative

Ruins of shed at easterly end of Long Wharf

1 gelatin dry plate glass negative

Showing part of sheds on southerly side of Long Wharf after the fire

1 gelatin dry plate glass negative

North side of building 56 Long Wharf

1 gelatin dry plate glass negative

Interior of shed of Dominion - Long Wharf

1 gelatin dry plate glass negative

Broken grout mixer

1 gelatin dry plate glass negative

Broken grout mixer

1 gelatin dry plate glass negative

Cracks in building north wall of 12 Long Wharf

1 gelatin dry plate glass negative

Westerly wall of building 12 Long Wharf

1 gelatin dry plate glass negative

Cracks in northerly corner of building 60, Long Wharf

1 gelatin dry plate glass negative

Underpinning Old State House south side, Boston, Mass., February 3, 1903

Construction work for the subway system is seen around the Old Sate House. In the background on Washington Street, the Rogers Building is on the left and the Sears Building is on the right.

Underpinning old State House, easterly end, Boston, Mass., February 3, 1903

A worker examines supports at the Old State House subway construction site.

Underpinning Old State House, south side, Boston, Mass., February 3, 1903

Onlookers watch the subway construction at the Old State House. The Sears Building is in the background on the left side on Washington Street.

Underpinning Old State House, southeast corner, Boston, Mass., February 2, 1903

Details of the underpinning work can be seen in this image.

Underpinning Old State House, easterly end, Boston, Mass., February 3, 1903

Street traffic can be seen in the distance with the underpinning work in the foreground.

Park Street - Information Booth

1 gelatin dry plate glass negative